Main Water Pipeline Flushing at MyFitness Alfa on 24.09.2025

22. Sep 2025

We would like to inform you that, from 8PM on September 24th to 8PM on September 25th, scheduled flushing work will take place on the main water pipeline.

During and after the flushing work, there may be slight water turbidity, pressure changes, and the water may become saturated with air, giving it a white appearance. The concentration of air in the water is not harmful to health.

Thank you for understanding!

On the same topic